Part No.: CCHW3200IP-24V - SO: 6-110806-b - Question: How to Replace AD Board?
Replacement Procedure1. Loosened screws and removed maintenance cover. (Blue Portion)


2. Loosened screws. (Red Portion)
3. Loosened back cover’s screws ( bottom / right / left / top ) (Yellow Portion)
4. Removed AD board and cables. (Green portion and replaced the new AD board.)
Note: Please make sure cables connection.